

Zero-bill target for your home
Transition your Mysuru residence to self-owned solar infrastructure. We design wind-resistant mounting structures and handle complete CESC net-metering approvals in ten days.


Direct subsidy processing
Engineered for Karnataka weather
Our local structural engineers design custom mounting systems built to withstand heavy monsoon winds, ensuring your rooftop installation remains secure for its entire 25-year lifespan.
Every system utilizes high-yield monocrystalline half-cut technology to maximize generation even during overcast monsoon days, keeping your zero-bill target within reach.
Engineered rooftop packages
3 kW System
5 kW System
10 kW System
Ideal for independent houses with monthly bills under ₹3,000. Includes monocrystalline panels and full CESC net-metering.
Optimized for multi-floor residences. Powers air conditioning and water heaters with a high zero-bill target.
Premium high-yield array for large estates and commercial-residential hybrids. Maximum subsidy yield.
Rooftop solar clarity
How long does the CESC approval take?
Do panels work during monsoons?
We handle all liaisoning. The physical installation takes 3 days, and net-metering approval typically completes within 10 days.
Yes. Our monocrystalline half-cut panels are optimized for low-light performance, generating reliable power even during overcast Karnataka monsoons.
What is the subsidy amount?
Where is your showroom located?
Residential installations qualify for Central Government subsidies under PM-Surya Ghar, directly reducing upfront costs by up to ₹78,000.
Visit us on Outer Ring Road near Devegowda Circle to see our mounting structures and panels in person.
