/ ENGINEERED TIMELINE

Ten days from roof to grid

We bypass utility tariffs and grid instability with a structured ten-day pipeline. From structural engineering to final CESC net-metering approvals, our in-house team manages every single step.

THE TIMELINE

Your ten-day transition

No outsourced labor, no administrative delays. We coordinate engineering and government approvals in parallel to activate your system on schedule.

DAYS 1 - 3
DAYS 4 - 7
DAYS 8 - 10

Structural Design

Precision Mounting

Grid Integration

Our engineers analyze your rooftop load capacity and design wind-resistant mounting structures tailored for Karnataka's monsoon winds.

In-house technicians mount high-yield monocrystalline half-cut panels and install the inverter system with zero structural damage.

We manage all CESC liaisoning, meter testing, and subsidy paperwork. Your new bidirectional meter starts running backward on Day 10.

Close-up of high-grade monocrystalline solar panel textures with robust galvanized iron mounting structures under bright direct Mysuru sunlight.
Close-up of high-grade monocrystalline solar panel textures with robust galvanized iron mounting structures under bright direct Mysuru sunlight.
LOCAL INTEGRATION

Built for Mysuru conditions

Our showroom on Outer Ring Road houses our full engineering team. We don't use generic templates—every system is optimized for the local Mysuru sunshine yield and backed by a 25-year structural guarantee.