Ten days from roof to grid
We bypass utility tariffs and grid instability with a structured ten-day pipeline. From structural engineering to final CESC net-metering approvals, our in-house team manages every single step.
Your ten-day transition
No outsourced labor, no administrative delays. We coordinate engineering and government approvals in parallel to activate your system on schedule.
Structural Design
Precision Mounting
Grid Integration
Our engineers analyze your rooftop load capacity and design wind-resistant mounting structures tailored for Karnataka's monsoon winds.
In-house technicians mount high-yield monocrystalline half-cut panels and install the inverter system with zero structural damage.
We manage all CESC liaisoning, meter testing, and subsidy paperwork. Your new bidirectional meter starts running backward on Day 10.


Built for Mysuru conditions
Our showroom on Outer Ring Road houses our full engineering team. We don't use generic templates—every system is optimized for the local Mysuru sunshine yield and backed by a 25-year structural guarantee.
